PENERAPAN VALUE ENGINEERING PADA PEKERJAAN PONDASI PROYEK REHAB PASAR PAGI PROVINSI KALIMANTAN TIMUR

Authors

  • A. Joni Patila Program Studi Magister Teknik Sipil Universitas Islam Sultan Agung Semarang
  • Kartono Wibowo Program Studi Magister Teknik Sipil Universitas Islam Sultan Agung Semarang
  • Faiqun Ni'am Program Studi Magister Teknik Sipil Universitas Islam Sultan Agung Semarang

Keywords:

Value Engineering, Foundation, Cost Efficiency

Abstract

Pasar Pagi Samarinda, located in Gajah Mada, Samarinda, East Kalimantan, is a staple food market that is planned to be upgraded to a Type A market through a development project outlined in the Detail Engineering Design (DED). According to the DED document prepared by the consultant, the total project value is estimated to be IDR 364,459,686,000. To improve financing efficiency while maintaining construction quality, a Value Engineering (VE) analysis is required. The goal of Value Engineering is to analyze the construction design to achieve the desired function at a lower cost without compromising quality. This study aims to identify design components that can be replaced with more cost-effective alternatives while still being effective. The research method used is descriptive, both qualitative and quantitative, with analysis stages according to Value Engineering standards. The first stage involves gathering information about the initial project design. Next, a functional analysis is carried out to determine the needs of each component. During the creativity stage, alternative, more cost-efficient designs are proposed. The evaluation phase compares the alternatives based on cost and benefits, and finally, the recommendation phase provides the most cost-efficient design solution. The results show that replacing the bored pile foundation design with a pile foundation can significantly reduce construction costs. Using the pile foundation reduces the total project cost to IDR 379,536,168,000, lower than the initial design with a bored pile foundation valued at IDR 371,486,210,000. The cost savings of IDR 8,049,958,000, or about 2.12% of the total project value, indicate that the pile foundation alternative is an effective solution for reducing costs without compromising the construction quality of Pasar Pagi Samarinda

References

Ariana, I. K. A., & Lestari, D. A. (2023). Analisis kinerja proyek optimalisasi SPAM Gatak Kabupaten Sukoharjo dengan metode earned value. Journal of Integrated System, 6(1), 87-102.

Puri, A., Hardiyatmo, H. C., Suhendro, B., & Rifa’i, A. (2011). Kontribusi Koperan dalam Mereduksi Lendutan Sistem Pelat Terpaku pada Lempung Lunak. In Proc. of 9th Indonesian Geotech. Conf. and 15th Annual Scientific Meeting (KOGEI IX & PIT XV) HATTI (pp. 299-306).

Ariadi, Ariadi. "Faktor Kunci Sukses Penerapan Value Engineering (Ve) pada Bangunan Gedung di Indonesia." Rekayasa Sipil 6.2: 77-85.

Khafidho, Zaenal, et al. "Analisis Value Engineering Struktur Portal Proyek Rumah Sakit Onkologi Kotabaru Yogyakarta." Wahana Teknik Sipil: Jurnal Pengembangan Teknik Sipil 24.2 (2019): 104-116.

Woodhead, Roy, and Mohammed Ali Berawi. "Evolution of value engineering to automate invention in complex technological systems." International Journal of Technology 13.01 (2022): 80-91.

Daniarto, C. U., Oetomo, W., & Wulandari, E. (2022). Value Engineering In Planning Construction of Ampelsari Reservoir Pasuruan Regency. Devotion: Journal of Research and Community Service, 3(14), 2659-2674.

Eriyanti, M., Kuryanto, T. D., & Gunasti, A. (2024). Pengendalian Proyek Dengan Metode Earned Value Pada Pekerjaan Rehabilitasi Jaringan Irigasi Sumber Nangka Jember. Sustainable Civil Building Management and Engineering Journal, 1(1), 56-56.

Meilasari, S. K., Oetomo, W., & Witjaksana, B. (2023). Value Engineering Analysis On The Architectural Work Of The Arjosari Malang Type A Terminal Revitalization Project. Jurnal Ekonomi Teknologi dan Bisnis (JETBIS), 2(8), 556-570.

Pamadi, M., Umar, U. H., & Chen, N. (2021). Analisis Perbandingan Penjadwalan Proyek dengan Aktual Proyek Menggunakan Metode EVA (Earned Value Analysis) Pada Pembangunan Ruko 3 Lantai (Studi Kasus: Proyek Pembangunan Ruko De Monde Junction –Pasir Putih). Journal of Civil Engineering and Planning (JCEP), 2(2), 188-202.

Putra, R. A., Setiono, S., & Handayani, F. S. (2024). Value Engineering Analysis on Building Structure (Case Study: Java Steam Power Plant 9&10 2x1000 MW Suralaya Project). Sustainable Civil Building Management and Engineering Journal, 1(3), 11-11.

Shonata, M., Rifai, M., & Handayani, F. S. (2024). Analisis Value Engineering Pada Proyek Pembangunan Gedung Dengan Metode Analytical Hierarchy Process (AHP). Sustainable Civil Building Management and Engineering Journal, 1(3), 10-10.

Sugiono, S., & Winarno, S. (2023). Implementasi Value Engineering (VE) Pada Proyek Jalan Oleh Konsultan Dan Kontraktor. JURNAL RISET RUMPUN ILMU TEKNIK, 2(2), 33-42.

Thoengsal, J. (2023). PENERAPAN METODE VALUE ENGINEERING (VE) PADA PROYEK KONSTRUKSI. Insight Mediatama.

Yusuf, M., Parwati, C. I., & Nasution, A. R. (2021). Value Engineering Analysis of Decorative Lightning in Product Development. Tekinfo: Jurnal Ilmiah Teknik Industri dan Informasi, 9(2), 159-166.

Downloads

Published

2025-01-16

How to Cite

A. Joni Patila, Kartono Wibowo, & Faiqun Ni’am. (2025). PENERAPAN VALUE ENGINEERING PADA PEKERJAAN PONDASI PROYEK REHAB PASAR PAGI PROVINSI KALIMANTAN TIMUR. Journal of Innovation Research and Knowledge, 4(8), 6069–6084. Retrieved from https://www.bajangjournal.com/index.php/JIRK/article/view/9491

Issue

Section

Articles